Type 2 to Type 2 EV Charging Cable Bundle
Top Charger Type 2 Cable in use

🔥 We Recommend

Type 2 to Type 2 Cable | 4-in-1 Bundle

Introducing the Top Charger Type 2 to Type 2 cable. 7 metres, UKCA and CE marked, three-year warranty. Comes with a carry case, a magnetic charge port cover to keep out the rain and snow, and a plush black microfibre cloth.

Energy Storage Systems to charge cars on motorways

What is V2L guide
Top Charger Type 2 to Type 2 EV Charging Cable Bundle
Best Seller4-in-1 Kit

Type 2 to Type 2 7m Cable Bundle

7m, 32A, 7.2kW. Cable, carry case, port cover, cloth. UKCA certified. 3-year warranty.

£106.99
★★★★★
FREE 24-hr tracked delivery
Shop Cable ›
Top Charger Magnetic Waterproof Charge Port Cover
NewMagnetic Fit

Magnetic Charge Port Cover

Waterproof. Magnetic fit. Keeps rain and debris out while plugged in.

£12.99
★★★★★
FREE 24-hr tracked delivery
Shop Cover ›

The Government-owned organisation National Highways will invest in Energy Storage Systems (giant battery packs) to deliver rapid charging infrastructure on motorways where the grid can’t meet demand.

The announcement comes following COP26, with the investment aiming to close the gap in rapid charger availability.

An Energy Storage System (ESS) is a giant battery pack that can charge hundreds of electric vehicles before depleting. National Highways plans to install them at motorway service stations to enable rapid charging support in areas where grid infrastructure isn’t sufficient.

Energy Storage Systems are essentially giant battery packs that are charged at off-peak times by the grid. They then deliver charging to drivers at peak times, reducing strain on the grid and enabling rapid charge speeds.

The plan is to install around 20 Energy Storage Systems across some of the busiest stretches of motorway in England, unlocking rapid charging speeds in areas that would otherwise not have them.

An £11m investment will pay for the initial rollout, with National Highways expected to increase its investment in the future. The first ESS should be installed in 2022, with more rollouts in 2023 and 2024.

It isn’t clear who will manufacture or supply the Energy Storage Systems, but we do know the devices will be smart to control power output and input. A smart ESS has software that coordinates energy production and knows when to keep energy to provide reserves or release it to the grid. 

Source: Gov.

🎉 Top Charger Shop is live | Free 24-hour tracked shipping 🔥

Jamie Lewis loves his MGs and is the proud owner of the MG5 Estate, which he reckons is the best-value car in the world. "Speed ain't a thing, I just want a spacious, economical family car."